Chittagong Port Pictures

CPA - Guidelines for vessel entering at Chittagong Port


 April 11, 2022, 11:03 p.m.

A lot of Shipowner, charterers & Seafarers frequently ask the below Question about the Chittagong Port.  The below guidelines can assist all concerns in entering the vessel at Chittagong Port.

  • Maximum Draft > 9.50 Meters.
  • Maximum length > 190.00 Meters.
  • Maximum length > 170.00 Meters (Night Navigation)
  • Maximum draft for Main Jetty areas i.e. Jetty no.2 to 4 is upto 7.5Metre & Jetty No. 5 to Jetty no. 13 is 8.55 Metre.


For Master anchoring at Chittagong anchorage & entering harbor: -
 

  • Anchor at a safe distance from other vessels at anchor.
  • If the under-keel clearance is less than two meters there is a possibility that you will drag your anchor. This is more prominent during spring tides and during monsoons. The tide can be as strong as 6 to 7 knots per hour.
  • If you are lightering with other vessels alongside the chances of dragging anchor is even more.
  • As a precaution use more chains, keep your engine standby all the times and keep the nos. of a lighter vessel alongside to minimum.
  • Keep a good anti-theft lookout and employ watchmen onboard.
  • when maneuvering for anchoring or picking pilot never attempt to cross other vessel Bow at close range. Please remember the current here is very strong. You may ride on others cable.
  • Deep draught vessels lightering at Alpha anchorage shall shift to Bravo or Charlie when they attain required draughts to make room for safe anchoring of newly arrived deep draft vessels.
  • Complete reliance on ECDIS is discouraged. Cross check against upto date paper chart is advised.
  • Vessel must have at least 12 rope for safe berthing. Tanker vessel having wire rope must have at least 4 polypropylene rope.
  • To facilitate smooth operation, at berth master of mother vessel must allow lighter tanker/fresh water barge to stay alongside as required by Harbor Master office.
  • Vessel should have at-least 0.20M by stern trim for channel navigation to get good steering effect.
  • While at anchor never keep any loose mooring Rope/gear on deck

    The details of berthwise permissible length and draft and details of Night Navigations and other navigational information are given below: -

    1. Vessels upto 170.00M LOA with minimum speed 10 knots, vessels LOA exceeding 170.00M and upto 190.00M with speed 12 knots may be berthed at jetties 2 to 13 draught not exceeding 8.55 Metre.

    2. Vessels having maximum LOA upto 190.00M can be berthed at CCT, GSJ, NCT-1-4, DOJ-5-7 & KAFCO (A &U). Vessel having LOA 186.00M to 190.00M will be berthed at CCT, GSJ,NCT-1-4, DOJ-5-7 & K(A &U) with draught 0.50M less than the days permissible draught and LOA upto 170.00M with draught 0.50M less than the days permissible draught will be allowed to take berth at NCT-5. LOA upto 160.00M draught 9.50M at DOJ/4. LOA upto 186.00M draught 8.0M at RM/8. LOA upto 186.00M draught 6.0M at RM/9 & LOA upto 145.00M draught 7.5M at RM/10. Vessels having LOA upto 143.40M draught 8.25M and vessels having LOA more than 143.40M and upto 175.25M draught 7.90M can be berthed at TSP. Vessels having LOA upto 190.00M can be berthed at CUFLJ jetty and Vessel having LOA 186.0M to 190.00M will be allowed to take berth with draught 0.50M less than the days permissible draught not exceeding 8.50m.
    * LOA upto 190.00m can be berthed at NCT-5 for interim period due to repair work at NCT-4.
    * Condition apply.

    3. Vessels having LOA upto 161.00M with maximum draught 9.14M and LOA upto 170.00M with maximum draught 8.60M will be allowed to take berth at CCJ respectively subject to day’s
    permissible draught.

    4. LOA upto 190.0M and having draught not more than 7.5M may be berthed at DRY DOCK JETTY.

    5. The master of all vessels should declare correct freshwater draught to the pilot before entering the Harbour. This must be done in writing if the vessels is drawing the day’s maximum permissible draught or a draught within 0.15M of permissible draught. In such cases, on taking berth the draught may be checked by the Harbour Master and if the vessels draught is found more than the permissible draught, the Master will be held responsible for misdeclaration. However vessels draft in excess upto 15cm should not be denied entry.

    6. INWARD ship must present themselves at Pilot ground at least 3 hours before the daylight high water at outer anchorage to enter on a particular day, the entry, however, will be subject to
    availability of berth, permissible draught, daylight, rise of tide etc. However, priority vessels such as 24/48 hrs., RORO/CONTAINER, EXPORT LOADER etc. involving another vessel to be
    moved out from inside the Harbour for accommodating a Quota vessel should report to Pilotage ground at least 6(six) hours before the day’s predicted high water time.

    7. OUTWARD ship of light draught will leave with first daylight flood & ship with maximum draught for a particular day will leave about 2 hours before the high water.

    8. SHIP MOVEMENT generally commences about 4/5 hrs. before the day’s High water Time.

    9. MOVEMENT OF VESSELS on the day’s marked AM & PM depend upon draught, the rise of tide, availability of berth & available daylight. All concerned are to consult the Harbour Master 24hrs. before the movement. In such cases, Ship’s with day’s maximum draught will be handled during AM or PM depending on the availability of daylight hours.

    10. DURING the spring tide/freshets/foul weather vessels under 7 knots will not be normally handled and all such vessels will be classed as GRADE-II for operational purposes and shall be handled conveniently. Agents of such vessels are required to consult the undersigned well in advance.

    11. The port will not be responsible if the declared draughts are reduced due to conditions arising out of freshet effect or other causes which cannot be forecast. Owners & Owners agent are advised to consult the undersigned regarding deep draught vessels in advance.

    12. Vessels entering or leaving port must have full power on main engine & deck machinery’s, both anchors with full length of chain must be available for use at all time.

    13. All vessels entering/leaving port shall display their signal letters.

    14. (a) Arrived/Departed Ship : Line drawing 22006.0/ N from land towards sea, Vessel Crossing line will be treated arrived ship (North Bound) at Chittagong Port & allocation of berth will be on first come first serve basis.
    (b) VTMIS has been installed by CPA, system is running and operational round the clock.
    (c) Ship Masters are required to anchor clear of the “PROHIBITED ANCHORAGE”.
    (d) Ship Masters must not anchor their vessels near the River entrance.
    (e) Ship Masters must maneuver with great care while embarking/disembarking pilots.
    (f) Pilot ladder as per regulation must be provided.
    (g) Ship Masters must note that the strong tidal conditions prevail at outer anchorage and utmost. care must be taken while manoeuvering anchoring or heaving up anchors.
    (h) Crossing of bow at close range shall never be attempted.
    (i) Vessels proceeding to anchor at Chittagong Roadsteads with more than 8.0m draft and especially vessels to be engaged in lightering operation must use at least 9 shackles of chain in water.
    (j) Keep the second anchor and engines standby for immediate use. This is particularly important in the monsoon season.
    (k) While anchoring master should keep minimum of 5 shackle distances from another vessel, and avoid the Fore and Aft line of another vessel.
    (l) Vessel should anchor in designated anchor berth with the approval of VTMS control room. Scrap vessels should anchor in the designated area for them.

    15. Shipmaster are advised in their own interest to maintain watch on the Fo’castle and poop deck while the vessels are at outer anchorage.

    16. Ship master must sent their ETA, DRAUGHT and other particulars to the undersigned well in advance.

    17. All ships in port to provide requisite “RAT GUARDS” in the mooring ropes.

    18. Ship master on arrival and prior to departure, are required to ensure that the vessels draught marks are clearly visible for pilots to read the draught correctly.

    19. Ship master are required to ensure that no major chipping of ships side is carried out while their vessels are in port.

    20. UNDUE “SMOKING” from the vessels funnel within the port area is strictly prohibited.

    21. DISCHARGING of water on the jetty and listing of vessels while alongside is strictly prohibited.

    22. Karnafulli being a tidal river, it is essential for vessels entering port to have six good ropes (HAWSER & WIRE) forward and similar six ropes aft. for mooring purposes.

    23. IN AN EMERGENCY, signal for Tug in port consist of 4 prolonged blasts on the whistle.

24. IN AN EMERGENCY, the following may be contacted on PHONES:

25. VHF(R/T) watch is maintained in the Port Administrative building, round the clock and the same can be contacted any time during day or night channel-12(Frequency 156.6MHZ or
Channel-16, Frequency 156.8 MHZ) watch on 2182 KHZ is also maintained simultaneously.

26. All vessels within the port limit shall strictly comply with existing port rules.

27. Ship masters approaching Chittagong road are advised not to attempt to crossbow of vessels at anchor/underway to avoid drifting on them resulting in probable collision in view
of the prevailing strong current at outer anchorage. However, if it is inevitable to cross, shipmaster may do so with caution by giving wide berth to the vessels at anchor/underway considering the minimum velocity of the current being 6 knots and other marine factors.

28. When a vessel is given standby from Radio Control for entering Port & Pilot is on his way, it is advisable that shipmaster should heave up anchor and wait for the Pilot steaming the tide near about position, Patenga Lighthouse bearing 0450 (T) distance 2 miles if deemed safe to do so.

29. Vessels having container on deck obstructing clear view of forward and or obstructing clear view of starboard side when viewed from port bridge wing and vice versa will not be allowed to
navigate in the channel of Karnafulli River. When considering clear view, small craft crossing the vessels bow should be taken into account.

30. Vessels arriving for demolishing purpose are advised to drop anchor at Designated scrap anchorage(North of Alpha Anchor).

31. Under all circumstances international regulation for preventing collision at sea, 1972 and as amended in 2002 to be followed as closely as possible while navigating within the Port limit of CPA.

32. NIGHT NAVIGATION :
Vessels having LOA upto 170.00M with draught 0.50M less than the day’s permissible draught will be allowed to take berth and sail out from Jetty No.2 to 13, CCT, NCT, GSJ, DDJ, CUFLJ &
KAFCO for 02(two) months on trail basis w.e.f.: 02/06/2016.
Vessels with bridge on the Bow & vessels having containers on deck obstructing clear view forward will not be handled during night.

33. The permissible length overall (LOA) for the entry to the port for vessels having navigation bridge at the bow is limited to 165.00 metres.
To reduce the lateral windage area of CAR CARRIERS, RORO vessels and Passenger's vessels, the height from the water line to the upper must
cargo/passenger deck is limited to 15 meters for handling in the Karnafulli channel.
However, CAR CARRIER, RORO vessels, Passenger vessel and vessels having Bridge at the Bow exceeding above limit with length over all upto 170.00M may be handled conveniently subject to fair weather (Wind force below 10 knots) and with special arrangements (using extra tugs and extra pilot etc.).

34. Permissible Height of mast above water level is limited upto 52 Metre due to over head cable for berthing at jetties from 2 to 13.
Intending shipping agents may contact the Harbour Master/CPA and offer such ships for handling at least 24hrs. in advance.

 "All information source from DEPUTY CONSERVATOR  office, CHITTAGONG PORT AUTHORITY." 


Tags: chittagong container port terminal
Need Help? Chat with us

KEEP IN TOUCH

10th floor, Akhteruzzaman Center,
21/22 Agrabad C/A, Chittagong,
Bangladesh

+88 031 717253,
+88 01844177255

bdseaking@gmail.com
info@skmsbd.com

SKMS was registered SRPS in department of shipping, Bangladesh in 2007. We complied MLC-2006 in 2013. The company was certified by "Bureau Vetitus (BV)" in 2013. The next year in 2014, SKMS was registered as a ISO 9001:2008 certified company by RINA.

           

© Sea King Marine Services Ltd.

Developed by MidDayDreams